Dubbo Firming Power Station

Energy Transition Solutions has been working with local landowners and stakeholders in developing the Dubbo Firming Power Station since late 2020. ETS has now been engaged by the Dubbo Firming Power Station Project proponent as the development manager.

The Dubbo Firming Power Station Project involves the construction and operation of a firming power station and hydrogen plant, along with associated infrastructure including biofuel storage, gas and water supply and electricity network connections in the industrial zone of North Dubbo, New South Wales and within the Central West Orana Renewable Energy Zone.

The Project will provide dispatchable energy into the grid in periods of high demand or low supply.  The Project will provide grid firming/stability to electricity supplied by the Central West Orana REZ to support the NSW Government’s intent to ensure that NSW consumers have continued access to cheap, clean and reliable electricity.

Specifically, the Project will include:

  • 60 Megawatt (MW) dual fuel power station
  • 17.5MW Hydrogen generation plant
  • Biofuel storage
  • Water storage
  • Connection to adjacent gas infrastructure by a 500m high-pressure gas pipeline
  • ~2.5km high-pressure gas pipeline used primarily as a gas storage vessel
  • Connection to adjacent electricity infrastructure by a high voltage (66kV) electricity line
  • Connection to water supplies by water pipeline(s).

More information with respect to the Project can be found here or by downloading the project fact sheet.

Barnawartha Energy Hub

ETS is the developer of the Barnawartha Energy Hub – a firming power station and hydrogen plant situated on the Murray Valley Highway, Barnawartha North. The Energy Hub will support renewable energy generation in the North East region of Victoria and the broader East Coast energy market.

The Project will generally consist of:

  • 60 MW dual fuel power station
  • 20 MW Hydrogen generation plant
  • Water storage
  • Connection to adjacent gas infrastructure by a high-pressure gas pipeline
  • Connection to adjacent electricity infrastructure by a high voltage (66kV) electricity line
  • Connection to water supplies by water pipeline(s)

Horsham Energy Hub

ETS is the developer of the Horsham Energy Hub – a firming power station and hydrogen plant situated on the Western Highway, Horsham. The Energy Hub will support renewable energy generation in the Western region of Victoria and the broader East Coast energy market.

The Project will generally consist of:

  • 60 MW dual fuel power station
  • 20 MW Hydrogen generation plant
  • Water storage
  • Connection to adjacent gas infrastructure by a high-pressure gas pipeline
  • Connection to adjacent electricity infrastructure by a high voltage (66kV) electricity line
  • Connection to water supplies by water pipeline(s)